Home Improvements
1984-2026
New boiler/burner, 1984, and replaced boiler and water heater again 2014
American Alarm security system, 1984
Installed safe in basement floor
Added track and/or recessed lighting to all rooms
Installed 17th century English oak panelling in upstairs bedroom and powder room
Built tennis court with stone terrace overlooking court, and 220-volt line for lights, 1986
Underground sprinkler system with control
Paved driveway (original was gravel)
Built stone patio outside kitchen entrance
Built fenced cutting garden
Installed exterior floodlights and driveway lighting
New title 5 compliant septic system, 1997
Installed custom storm windows for original casements
Replaced kitchen cabinets, countertops, etc. and built working fireplace in kitchen (original chimney was an architectural feature), 2006
Updated upstairs en-suite bathrooms, including master with French limestone, 2003
Enclosed solarium off of kitchen with own
heating zone
Installed automatic humidifier with humidistat control
Invisible fence with controls in basement
Installed mini-split air conditioner for ground-floor, and central air conditioning for second floor, 2018
Refinished outdoor wooden surfaces, 2025
Repointed brick chimneys, 2025
Slate roof repair, 2025